Abstract transit infrastructure topology
DOD

ABT Topology Manager / DOD Parameters

DOD Parameter
Management

Set up PTO-specific DOD parameters for equipment categories such as L1 validators and TVM devices under the hybrid DOD operating flow with version-based approval. Maintain precise control over device assignment configurations across all transport modes.

Operating Flow

Hybrid DOD

L1 device assignment with version-controlled parameter sets

Equipment Scope

L1 Validators & TVM

Category-specific parameter configuration per PTO

Approval Workflow

Version-Based

Staged approval pipeline from draft to production

Scroll

01

Define

Specify PTO ID, equipment category, and transport mode for each parameter set

02

Configure

Set key-value parameter pairs and assign DOD version identifiers for traceability

03

Approve

Progress parameters through the approval workflow from draft to active deployment

04

Deploy

Push approved DOD parameters to L1 devices across all assigned transport modes

New Entry

Create DOD
Parameter

Define a new DOD parameter entry specifying PTO ID, equipment category, transport mode ID, parameter key-value pair, DOD version, and approval status. Each entry is versioned and tracked through the hybrid DOD operating flow for L1 device assignment.

Required Fields

  • PTO Identifier
  • Equipment Category
  • Transport Mode ID
  • Parameter Key & Value
  • DOD Version
  • Approval Status

Registry

DOD Parameter
Registry

All DOD parameter entries showing PTO, equipment category, transport mode, parameter details, version, and current approval status for L1 device assignment across the hybrid DOD operating flow.

Live Registry — Auto-refreshes on change
PTO ID Approval Status Equipment Category Created Actions

Loading DOD parameter registry…

Filter by Status

Use the approval status column to identify parameters awaiting review or ready for L1 device deployment.

Version Tracking

Each DOD parameter entry carries a version identifier ensuring full traceability across the hybrid DOD operating flow lifecycle.

PTO Isolation

Parameters are scoped per PTO, ensuring equipment category configurations remain isolated and conflict-free across operators.

Next Step

Review Topology
Data

Explore the topology records imported from PTA AFC and JP interfaces to validate transport mode assignments against your configured DOD parameters.

Open Topology Data